Direct Answer

Small modular reactor developers design reactors of a few hundred megawatts or less that can be built in factories and shipped to sites. Most are pre-revenue, so milestones such as design approval, first orders and funding matter more than earnings.

Industry Overview

Small Modular Reactor Developers sits within the energy sector. The first numbers to compare across companies here are regulatory design approval stage, orders or letters of intent and cost per kilowatt estimates. The outside forces that move them are listed under Primary Macro Drivers.

Key Industry Metrics

  • Regulatory design approval stage: Where the design stands in the regulator's review, from pre-application to certification. Moving through stages lowers licensing risk; delays push back any first revenue.
  • Orders or letters of intent: Customer commitments to buy or study reactors. Letters of intent are non-binding, so firm orders with deposits carry far more weight.
  • Cost per kilowatt estimates: Projected build cost per kilowatt of capacity. These are projections for unbuilt designs, and first-of-a-kind nuclear projects have often cost more than predicted.
  • Cash runway and funding: How long cash lasts and what financing has been secured. Pre-revenue developers rely on equity and grants, so funding events and dilution are central.
  • Partnerships with utilities and governments: Agreements with power companies and public bodies for siting, funding or procurement. They help with financing and licensing, though they vary in how binding they are.

Primary Macro Drivers

  • Government support and licensing reform: Funding and faster review reduce time and cost to approval, shifting the regulatory design approval stage and customers' willingness to sign.
  • Demand for firm clean power, including data centers: Buyers wanting steady carbon-free supply sign letters of intent and partnerships, which is the main evidence of future orders.
  • Fuel supply for advanced designs: Some designs need fuel types not yet widely produced, so availability decides whether first units can operate on schedule.
  • Construction cost evidence: Buyers and lenders need proof of cost, so first-project results shape later orders and the cost per kilowatt estimates.

Major Risks

  • Regulatory and licensing delay: Approval takes years and can slip, pushing out revenue and requiring more funding; watch regulator review milestones and schedules.
  • Cost overruns versus projections: If first units cost more than promised, buyers may turn away; watch updated cost per kilowatt estimates against earlier targets.
  • Funding and dilution: With no revenue, spending is covered by new shares or partners, which dilutes holders; watch cash runway and recent financing terms.
  • First-of-a-kind technology risk: Unbuilt designs may face problems in construction or operation; watch demonstration results and any design changes after review.

Industry Characteristics

CharacteristicProfile
CyclicalityMixed
Capital IntensityHigh
Regulatory IntensityHigh
Industry MaturityEmerging
Geographic ImportanceU.S. / Global

Companies Associated with Small Modular Reactor Developers

The SEC's Standard Industrial Classification has no code that describes small modular reactor developers as a group, so there is no complete list of its filers. The companies below come from Swoopr's SEC dataset and have operations in or next to the industry. Each is classified by the SEC under its own main business.

CompanySEC classificationRevenueGrowthNet marginYear
Bwx Technologies, Inc.Engines & Turbines$3.2 billion18.3%10.3%FY 2025
Nuscale Power CorpFabricated Plate Work (Boiler Shops)$31 million-15.0%-1130.3%FY 2025

Source: each company's own annual report as filed with the SEC (XBRL data), figures in U.S. dollars. Listing here describes a business relationship to the industry, not a recommendation. To find more companies, use the company directory and the energy hub.

Where to Go Next

The Small Modular Reactor Developers guide describes how the industry earns money, what to measure and what can go wrong. To see how it compares, read the neighbouring industries in the same sector, then apply the same checks to a specific company.

More in Energy

Put it to work

Frequently Asked Questions

What are the main KPIs for the Small Modular Reactor Developers industry?

Key performance indicators for the Small Modular Reactor Developers industry include: Regulatory design approval stage, Orders or letters of intent, Cost per kilowatt estimates, Cash runway and funding, Partnerships with utilities and governments. Which matter most depends on the company's model, so compare them across several companies rather than relying on one.

How cyclical is the Small Modular Reactor Developers industry?

The Small Modular Reactor Developers industry exhibits mixed cyclicality characteristics. Some segments move with the broader economy while others maintain more stable demand, making stock selection within the group particularly important.

What are the biggest risks in the Small Modular Reactor Developers industry?

The primary risks for Small Modular Reactor Developers companies include: Regulatory and licensing delay, Cost overruns versus projections, Funding and dilution, First-of-a-kind technology risk. Investors should assess each company's exposure to these factors and its track record of navigating them.