Broker Integrations Tool
Sandbox-to-Live Readiness Checklist
Investment Education, Research & Tools for Smarter Decisions.
Work through every readiness gate before switching your broker integration from sandbox to live capital: authentication, order type validation, risk limits, structured logging, monitoring and alerting, and kill switch verification.
Direct Answer
A sandbox-to-live readiness checklist verifies that a broker integration is safe to switch from a paper or sandbox environment to live capital, covering authentication, order type validation, risk limits, structured logging, monitoring, and kill switch verification. Every blocker item must be checked off before the tool issues a go/no-go verdict. Sandbox and live behavior frequently diverge in ways that only surface once real money is at risk.
Tool
Check each item once you've verified it. Blockers must all be checked before going live. Click Assess Readiness at the bottom to see your go/no-go verdict.
Completing this checklist does not guarantee safe live operation. Test with minimal capital first and maintain the ability to halt trading at any time.
How to Use This Tool
Work through the checklist categories in order, earlier categories (Authentication, API Connectivity) are prerequisites for later ones (Risk Controls, Monitoring). Each item describes a specific condition that must be true before it's safe to trade real capital. Check the item only after you've verified it directly, not from memory.
Items labeled Blocker (red) are hard gates: the integration is not safe for live trading until every Blocker is checked. Items labeled Required (amber) are strongly recommended and should be checked before live trading of meaningful position sizes. Items labeled Recommended (blue) improve long-term reliability and should be completed within the first week of live operation.
When you click Assess Readiness, the tool produces a go/no-go verdict with a list of unchecked blockers if any remain. The checklist resets on page reload, take a screenshot or print the page to keep a record of your readiness review.
Understanding the Outputs
A Go verdict means all Blocker items are checked and a majority of Required items are checked. This is the minimum standard for switching to a live account. It does not mean the integration is bug-free. It means the known minimum safeguards are in place.
A Caution verdict means all Blockers are checked but some Required items remain unchecked. Trading with minimal capital is permissible, but the missing Required items represent real risks that could cause unexpected behavior under market stress conditions. Complete the missing items before scaling position sizes.
A No-Go verdict means one or more Blocker items are unchecked. Do not switch to live trading. The verdict lists the specific unchecked Blockers so you can address them in order. Return to sandbox testing until all Blockers are verified.
Assumptions and Limitations
- This checklist covers integration-layer readiness, not strategy validation. A strategy can be technically integrated but still unprofitable, poorly backtested, or misaligned with live market conditions. Strategy validation is a separate process.
- Checklist state is stored only in memory, it resets on page reload. This is by design; readiness should be verified fresh before each transition to live trading, not carried over from a prior session.
- The checklist is a structured guide, not a regulatory or compliance checklist. If your trading is subject to regulatory requirements, consult with a compliance professional separately.
- After going live. Do not treat this checklist as permanent. Broker API changes, strategy changes, and new asset classes all require re-running the relevant sections before the next deployment.
FAQ
What is the most common reason automated trading systems fail on the first day live?
The most common failure mode is production-only error codes that never appeared in sandbox. The broker rejects an order with an error code the adapter doesn't recognize, the error classification logic defaults to "retry," and the system repeatedly resubmits the same rejected order, sometimes entering a position multiple times or exhausting rate limits within minutes. The fix is explicit error contract tests for every error category and a default classification of "non-retryable" for unrecognized error codes.
How much capital should I use for the initial live test?
Use the smallest position size your broker allows, typically a single share of a low-priced stock or a fractional share. The goal is not to test profitability but to verify that orders enter and exit correctly, fills are reported, positions update, and the kill switch works. Once you've confirmed one complete entry and exit cycle live, you can scale to your intended position sizes. Many systems also use a "shadow mode" phase where the strategy generates signals and the system submits orders, but a human approval step is required before each order reaches the broker.
What is the kill switch and how should it work?
A kill switch is a mechanism to immediately halt all automated trading, cancel all open orders and stop new order submissions, with a single action. It should work independently of the strategy code: a bug in the strategy that causes it to stop responding shouldn't also disable the kill switch. Implement it as a flag in a shared data store (database, environment variable, or file) that the order submission path checks before every submission. The kill switch test (Blocker item in this checklist) verifies that activating it actually prevents new order submissions within one order cycle.
What is a "position size guardrail" and why is it a blocker?
A position size guardrail is a hard limit in your order submission code that rejects any order larger than a configured maximum (e.g., never submit an order for more than 500 shares or more than $10,000 notional). This prevents a bug in your position sizing calculation from accidentally submitting an order 100× your intended size. It must be a hard code check, not just a strategy-level parameter, strategy bugs can override strategy-level parameters, but they can't override a check embedded in the adapter layer itself.
Should I complete this checklist once or before every deployment?
Before every deployment that changes integration behavior, any change to the adapter layer, any change to order routing, any broker API version update, or any addition of a new order type or asset class. For pure strategy changes (signal logic, position sizing) that don't touch the integration layer, you can run only the relevant sections (risk limits, kill switch) rather than the full checklist. When in doubt, run the full checklist; it takes 20-30 minutes of real verification work and prevents hours of debugging live failures.
Which items on this checklist can only be verified in production?
Anything depending on real counterparty behavior: actual rate limit accounting, genuine rejection reasons from the risk system, real settlement and buying power updates, live latency, and how the broker reports asynchronous state changes under load. These can be prepared for but not confirmed beforehand, which is the argument for a first live session at minimal size whose purpose is observation rather than return. Marking them explicitly as production-verified keeps the checklist honest about what sandbox testing established.
What should the rollback plan contain?
A defined trigger, a named person able to act on it, and the specific sequence to execute: halt new order submission, cancel resting orders, decide whether to flatten or hold existing positions, and record the state at the moment of the stop. It should also state where positions and cash will be reconciled afterwards and who confirms the system is genuinely stopped. A plan that exists only as an intention to turn it off usually costs time at exactly the point when time matters.
How should the first live session be monitored?
With a person watching who can intervene, rather than relying on alerting alone, because the first session is where unknown failure modes appear and alerts only cover anticipated ones. Useful things to watch directly are order acknowledgement latency, rejection reasons, the running difference between internal and broker positions, and whether any order reaches a state the model does not recognize. Scheduling the session at a time when that attention is available is part of the readiness decision.
What evidence should be recorded that each item passed?
A tick against an item is not reviewable later. Recording what was tested, when, in which environment, and what the observed result was turns the checklist into something that can be audited and reused for the next deployment. It also exposes items that were assumed rather than exercised, which is the usual reason a checklist passes and the first live session still fails. Keeping the evidence alongside the release record makes the connection to a specific version explicit.